News
Rubus Product Line 2012a is released
Rubus Product Line 2012a is released for testing. This is the feature complete release of 2012a. It has been tested using our quality testing methods e.g. test models and protocols but might still contain bugs.
If you find a bug or misfeature then use the issue management report system to report it. One or more release candidates may be released if reported bugs need to be fixed.
The grace period will end in 2012-05-31.
Rubus Product Line 2011c.1 is released
Rubus Product Line 2011c.1 is released for testing. This is a first release candidate of the 2011c.1 release. It has been tested using our quality testing methods e.g. test models and protocols but might still contain bugs.
If you find a bug or misfeature then use the issue management report system to report it. One or more release candidates may be released when reported bugs deemed to be fixed in 2011c.1 release until the final build.
The grace period will end in 2011-12-31.
Rubus Product Line 2011c is released
Rubus Product Line 2011c is released for testing. This is a first release candidate of the 2011c release. It has been tested using our quality testing methods e.g. test models and protocols but might still contain bugs.
If you find a bug or misfeature then use the issue management report system to report it. One or more release candidates may be released when reported bugs deemed to be fixed in 2011c release until the final build.
The grace period will end in 2011-12-19.
Rubus Product Line 2011b is released
Rubus Product Line 2011b is released for testing. This is a first release candidate of the 2011b release. It has been tested using our quality testing methods e.g. test models and protocols but might still contain bugs.
If you find a bug or misfeature then use the issue management report system to report it. One or more release candidates will be released when reported bugs are fixed until the final build which will be at the end of August.
The test grace period will end in 2011-08-30.
Rubus Product Line 2011a is released
Rubus Product Line 2011a is released for testing. The test grace period will end in 18/2 2011.
Issue management switch
Arcticus have moved from bugzilla to redmine issue management system. The old bug database will be held online for a while until all relevant issues have been moved over to the new database.
The old URL will be accessible for a while until it will be permanently shutdown.
http://bugzilla.arcticus-systems.com
The new URL is:
http://issues.arcticus-systems.com
Also available in: Atom